LUSAIL CP3A2 Bridge Project

CLIENT Samsung Engineering & Construction group

SCOPE OF WORK

The work shall generally comprise of grinding & leveling of concrete surface from 30mm to 0mm level by using a scarifier and grinding machine for smooth finish for Bridge 3, Bridge 4, Bridge # 5 & Bridge # 7.
Installation works such as utility piping (potable waterline, sewerage line, TSE pipe) and Testing and commissioning of the same. Installation, maintenance & dismantling of all required Scaffolding, platform works also in the part of scope.

Installation works such as utility piping (potable waterline, sewerage line, TSE pipe) and Testing and commissioning of the same. Installation, maintenance & dismantling of all required Scaffolding, platform works also in the part of scope.